CONSTRUCTION OF TWO DUAL FUEL BOILERS FARAB
![Construction of two dual fuel boilers](../my_upload/filethumb/thumb_1682497796.jpg)
CONSTRUCTION OF TWO DUAL FUEL BOILERS
Construction of two dual fuel boilers
The use of Phc Piles by BGA Piles
Diameter 450 with length of 15 and 18 meters, total length of about 7 km
Implementation of pile driving operation with static hydraulic device of Sema company
Employer: Farab Construction and Installation Company
Contractor: SEMA company