STATIC LOADING TEST
STATIC LOADING TEST OF THE PHC PILE USING THE JACKED-IN PILING MACHINE
Carrying out the static loading test of the PHC pile using the Jacked-in piling machine - SEMA construction Company
Implementation of pile driving operation with static hydraulic device of Sema company in Ahvaz project , The employer is Farab
*The drift of 450 and 600 mm centrifugal piles in lengths of 6, 9, 12 and 15 meters
*The possibility of reading the thrust force of the pile
* The possibility of using the weight of the device as a static test overhead
*Increasing accuracy and execution speed
*Automatic plumb line
*The possibility of pushing and delivering the pile head below the ground level
**Possibility of pulling out the pile if needed
Contact Us
A Solid Foundation For Your Investment
Khouzestan 5-cities wastewater treatment plant
Monday 29th June 2020
Construction of two dual fuel boilers Farab
Saturday 29th April 2023
BGA ISO Certificates
Wednesday 08th July 2020
Participation in the Infra Oman International Exhibition in 2018 in Muscat
Saturday 26th January 2019